We had to replace the entire roof removing composite roof tiles with Welsh slate
Most wood was replaced. The only wood that remained were the 200yr old Oak A Frames. Built to last!
We had to dig out the internal floor to a depths of 40 cm, then fill with tons of concrete
Smoothing the concrete to get a level floor, before floor insulation is fitted.
Getting ready to batten all the walls and insert wall insulation
Rebuilt the old public toilet block
The underfloor heating being laid. Walls ready to take insulation before boarding, plastering and painting
One of the air source heat pumps, plus hot water storage tanks and water pressure unit, to ensure everywhere is warm and toasty. Plus you get a lovely shower in the Ensuite rooms.